Concrete Calculator

Enter the dimensions of what you are pouring. This gives you the volume in cubic yards for a ready-mix order, and the bag count if the pour is small enough to mix on site.

Your numbers

Result

Order this much
5.43
cubic yards
Exact volume
4.94cubic yards
80 lb bags0.60 cu ft each
245bags
60 lb bags0.45 cu ft each
326bags
Volume
133.3cubic feet
Slab area
400sq ft

How this is calculated

  • Volume in cubic feet = length × width × (thickness in inches ÷ 12).
  • Cubic yards = cubic feet ÷ 27.
  • Order volume = cubic yards × (1 + allowance).
  • An 80 lb bag yields about 0.60 cubic feet; a 60 lb bag about 0.45.

Before you order

  • Past about half a cubic yard, bags stop making sense - that is roughly 20 eighty-pound bags for one small pad, mixed and placed before any of it starts setting.
  • Ready-mix plants have a minimum order and usually charge a short-load fee under it. Ask before you book.
  • Order slightly long, never slightly short. A cold joint from a half-hour wait for a second truck is a permanent defect in the slab.
  • This is volume only. Rebar or mesh, vapour barrier, forms, and the compacted base underneath are separate.