Contractor Estimator

Price a whole job in one place. Enter quantities for the trades you are doing, adjust the unit costs to your own numbers, and this rolls it up with labour burden, contingency, overhead and margin already applied. Nothing is sent anywhere — it saves in your browser.

Excavation and haul-off
Interior demolition
per sq ft
Dumpster and disposal
per each
Rough grading
per sq ft
Silt fence and erosion control
per linear ft

Job settings

Price to quote
$0
0 line items · $0 profit
Materials
$0
Labour
$0
Burden @ 30%On labour only
$0
Direct cost
$0
Contingency @ 5%
$0
Overhead @ 15%
$0
Total cost
$0
Margin @ 20%
$0
Equivalent markupWhat you'd add to cost
0.0%

Unit costs are national mid-range defaults. Overwrite them with your own — the price is only as good as the numbers you feed it.

How the rollup works

  • Each line splits into materials and labour using that trade's own labour share — drywall is 70% labour, cabinets are 30%. Burden is applied to the labour half only.
  • Direct cost = materials + burdened labour.
  • Contingency and then overhead are applied on top of direct cost.
  • Price = total cost ÷ (1 − margin). Margin is divided, not multiplied — a 20% markup only leaves a 16.7% margin.

Before you send it

  • This is a budget estimate, not a bid. It has no allowance for permits, engineering, bonding, winter conditions or anything specific to your site.
  • Renovation carries far more unknown than new build. If you cannot see behind the wall, 10–15% contingency is the honest number.
  • Get real subcontractor quotes before committing to a price. Defaults are a starting point for a conversation, not a substitute for one.
  • Write your exclusions down. Most disputes are about what was never in the estimate, not about what was.